by Bailey Construction | Apr 26, 2024
Case Study:JCB Grandstand JCB Grandstand Conversion of JCB ITC into new Grandstand Bailey Construction was appointed by Bamford Property Ltd to transform the former JCB ITC (International Training Centre) into a modern, purpose-built grandstand, creating a...
by Bailey Construction | Apr 26, 2024
Case Study:Clifton Methodist Church Clifton Methodist Church Extension & Alterations The refurbishment of w/c’s and kitchen area including a new mezzanine deck and store area, the replacement of the external windows and doors and internal doors, to include new...
by Bailey Construction | Apr 25, 2024
Case Study:JCB Loadall PDI Building JCB Lodall PDI Facility Extension to Pre-Delivery Inspection Facility Extension to Loadall Pre-Delivery Inspection facility with associated drainage and external services. Completely stripped the existing building extending...
by Bailey Construction | Apr 23, 2024
Case Study:The Tramway Museum, Crich The Tramway Museum, Crich Refurbishment of Depots The project consisted of removing existing roof and claddng sheets including asbestos cement sheeting and replace with new Kingspan insulated sheets. We supplied and installed 2...
by Bailey Construction | Apr 11, 2024
Case Study:Derbyshire County Cricket Club, Media Centre Derbyshire County Cricket Club Media Centre Converting an unused area below the multi-media centre, to complete a new Muliti-faith centre, including Unisex facilities and additional storage. All new drainage...